This project included the partial removal of an existing two level parking garage. The construction of the new three story Station 2 terminal tunnel access structure included the installation of elevators, escalators, fire protection, fire alarm, plumbing, mechanical and electrical systems. Work on this project also included the refurbishment of the existing terminal tunnel inclusive of terrazzo flooring, suspended grid ceiling system, painting and lighting.